Overview #
An inspection finding may require action to correct a defect, control a risk or investigate an uncertain condition.
AssetIQ can help authorised users convert an inspection finding into a traceable follow-up action or maintenance work order. Linking the corrective work to the inspection and asset provides a clearer history from initial detection through completion and verification.
Important: Creating a follow-up action or work order does not mean that the defect has been resolved. Keep the finding open until the required work has been completed and verified.
Before you begin #
Before creating corrective work, confirm that:
- The correct inspection has been submitted
- The finding has been reviewed
- The affected asset has been identified
- The defect description is clear
- The severity or priority has been assessed
- Immediate safety actions have been taken
- The appropriate follow-up method has been selected
- A responsible person or team is available
- The required completion date is understood
- You have permission to create actions or work orders
If the finding presents an immediate hazard, follow your organisation’s safety and isolation procedures before creating the record in AssetIQ.
Follow-up action versus work order #
Choose the record type that best matches the work required.
| Record type | Use it when | Example |
|---|---|---|
| Follow-up action | The response is administrative, investigative or does not require structured maintenance work | Confirm the asset’s certification expiry date |
| Work order | The asset requires inspection, servicing, adjustment, replacement or repair by maintenance personnel | Replace the damaged hydraulic hose |
| Reinspection | The condition must be checked again after work or when access becomes available | Reinspect the repaired emergency-stop circuit |
| Escalation | A manager, safety specialist or technical authority must make a decision | Obtain engineering assessment of a structural crack |
| No further action | The finding has been reviewed and formally accepted without corrective work | Monitor minor cosmetic damage during routine inspections |
Your organisation may use different terminology or processes. Select the option configured in AssetIQ that provides the necessary control and traceability.
When to create a follow-up action #
A follow-up action may be appropriate when the required response involves:
- Obtaining additional information
- Confirming an asset’s documentation
- Replacing a label or sign
- Contacting a supplier
- Arranging a specialist assessment
- Monitoring a condition
- Updating an operational procedure
- Providing user training
- Investigating a recurring issue
- Scheduling another inspection
- Correcting an authorised asset record
- Confirming that a temporary control remains effective
The action should clearly identify what must happen, who is responsible and when it must be completed.
When to create a work order #
Create a work order when the finding requires structured maintenance or repair activity, such as:
- Repairing a defective component
- Replacing a worn or damaged part
- Correcting a fluid leak
- Restoring a safety device
- Performing electrical or mechanical testing
- Adjusting or calibrating equipment
- Conducting preventive maintenance
- Inspecting an inaccessible component
- Completing specialist repair
- Testing the asset after corrective work
A work order creates a separate operational record for planning, assigning, performing and documenting the required work.
Open the inspection finding #
- Sign in to AssetIQ.
- From the sidebar, open Asset Inspections.
- Find and open the relevant inspection.
- Open the inspection findings or defects section.
- Select the finding requiring action.
- Review its details and supporting evidence.
Before continuing, confirm:
- Asset number and description
- Inspection reference
- Checklist item
- Finding description
- Defect location
- Severity
- Photographs or attachments
- Immediate action taken
- Inspection result
- Reviewer comments
Do not create corrective work against the wrong asset or finding.
Review existing work #
Before creating a new action or work order, check whether the finding is already linked to:
- An open work order
- An existing fault report
- A repair request
- A maintenance activity
- A corrective action
- Another inspection
- A previously reported recurring defect
Avoid creating duplicate work for the same issue.
If an existing record already covers the required response, link or reference it according to your organisation’s process.
Create a follow-up action #
If a follow-up action is appropriate:
- Open the inspection finding.
- Select Create Action, Add Follow-up or the corresponding option.
- Confirm that the inspection, asset and finding are linked.
- Enter a clear action title.
- Describe the required outcome.
- Select the responsible person or team.
- Set the priority.
- Enter the required completion date.
- Add instructions or evidence.
- Save and assign the action.
- Confirm that it appears against the inspection finding.
If no direct creation option is available, create the action using the applicable AssetIQ function and include the inspection and finding references.
Enter a clear action title #
The title should briefly describe the required outcome.
Preferred titles #
- Confirm certification status for CRN-0042
- Replace unreadable QR label on FLT-018
- Arrange structural assessment of boom crack
- Investigate recurring battery-temperature warning
- Reinspect generator after load testing
Titles to avoid #
- Fix issue
- Follow up
- Inspection problem
- Action required
- Check asset
A specific title makes the action easier to assign, find and monitor.
Describe the required action #
The action description should explain:
- What must be done
- Why it is required
- Which asset and finding it relates to
- Any applicable restrictions
- What evidence is required
- What constitutes completion
- Whether reinspection is needed
Example:
“Arrange assessment by an authorised engineer of the 30 mm crack recorded beside the upper boom mounting bracket during inspection INS-0128. Asset must remain isolated until the assessment is complete. Attach the engineering report and record the recommended corrective action.”
Do not simply copy the finding description. The finding explains the problem; the action explains the required response.
Create a work order from the finding #
If the defect requires maintenance or repair:
- Open the inspection finding.
- Select Create Work Order, Raise Work Order or the corresponding action.
- Confirm that the correct asset is selected.
- Confirm that the inspection and finding references are carried forward.
- Enter the work-order title.
- Describe the required maintenance work.
- Select the work type or category.
- Set the priority.
- Assign the responsible person or team.
- Enter the planned or due date.
- Add safety instructions.
- Attach relevant evidence.
- Save or issue the work order.
- Confirm that the work order is linked to the finding.
The exact fields and workflow depend on your organisation’s AssetIQ configuration.
Enter the work-order details #
A work order created from an inspection finding may include:
- Work-order title
- Asset
- Inspection reference
- Finding or defect reference
- Work type
- Maintenance category
- Description
- Priority
- Responsible person or team
- Planned start date
- Due date
- Location
- Safety instructions
- Operational restrictions
- Required parts
- Required skills
- Supporting photographs
- Completion criteria
- Reinspection requirement
Review all automatically populated information before saving.
Write a clear work description #
The work description should be specific enough for the assigned person to understand the required activity.
Preferred work description #
“Replace the leaking hydraulic hose connection beside the rear-left stabiliser. Clean the affected area, inspect adjacent hoses, refill hydraulic oil as required and perform a pressure test. Asset must remain isolated until the repair and test have been completed.”
Description to avoid #
“Repair hydraulic issue.”
Do not prescribe a technical solution unless it has been appropriately assessed and authorised. If diagnosis is still required, state that clearly.
Set the priority #
Base the priority on the finding’s severity, operational impact and required response time.
A typical relationship may be:
| Finding | Possible work priority |
|---|---|
| Immediate safety or environmental risk | Emergency or critical |
| Significant defect requiring urgent attention | High |
| Defect requiring scheduled correction | Normal or medium |
| Minor non-urgent issue | Low |
| Condition requiring investigation | Based on potential risk and deadline |
Use your organisation’s approved priority definitions.
A high-severity finding should not be given a low-priority work order solely because resources are unavailable.
If the required response cannot be completed promptly, apply the appropriate operational restrictions and escalate the risk.
Assign responsibility #
Assign the action or work order to a person or team that:
- Has the required authority
- Has the necessary technical skills
- Can access the asset
- Can complete the work safely
- Can meet the due date
- Understands the recorded defect
- Can provide the required completion evidence
Do not assign specialist, electrical, structural or legally controlled work to an unqualified user.
If the work will be completed by an external supplier, assign internal responsibility for coordinating and verifying it.
Set the due date #
Choose a due date based on:
- Finding severity
- Safety implications
- Operational requirements
- Asset availability
- Parts or specialist availability
- Compliance deadlines
- Temporary controls
- Required reinspection
- Approved service-level expectations
Do not set an arbitrary date merely to complete the form.
If the asset must remain out of service, make that restriction clear regardless of the work order’s due date.
Add safety and operational instructions #
Include relevant controls such as:
- Asset must remain isolated
- Do not operate until authorised
- Lockout or tagout is required
- Complete repair before the next shift
- Use specified personal protective equipment
- Obtain a permit before work
- Perform testing before return to service
- Require specialist approval
- Reinspect before use
- Notify the asset owner when complete
AssetIQ records the instruction, but physical safety controls must also be applied according to your organisation’s procedures.
Attach supporting evidence #
Add relevant information from the inspection, such as:
- Defect photographs
- Measurements
- Inspector comments
- Reviewer comments
- Test results
- Previous inspection findings
- Manufacturer instructions
- Technical documents
- Affected component details
Confirm that sensitive or restricted information is shared only with authorised users.
Define completion criteria #
State what must be true before the action or work order can be considered complete.
Completion criteria might include:
- The defective component has been replaced
- The leak has been eliminated
- The safety device passes a functional test
- The required measurement is within the accepted range
- A specialist report has been attached
- Photographic evidence has been provided
- The asset status has been reviewed
- A follow-up inspection has passed
- An authorised person has approved return to service
Without clear completion criteria, work may be closed without demonstrating that the finding was addressed.
Save and issue the work #
After reviewing the record:
- Select Save, Create or the corresponding action.
- Confirm that the record was created.
- Review its reference number.
- Confirm the responsible person or team.
- Check the priority and due date.
- Confirm the asset and inspection links.
- Issue or assign the work if an additional action is required.
- Notify the responsible person according to your process.
A saved draft may not be visible to the assigned person until it has been issued or assigned.
Confirm the link to the inspection #
After creating the action or work order:
- Return to the inspection finding.
- Confirm that the linked record is visible.
- Open the link.
- Check that it points to the correct action or work order.
- Confirm that the inspection reference appears on the corrective-work record.
- Record the reference in reviewer comments if necessary.
The relationship should be traceable in both directions wherever AssetIQ supports it:
- Inspection finding → corrective action or work order
- Corrective action or work order → originating inspection finding
Create multiple actions when required #
One finding may require several independent responses.
For example, a failed safety-device inspection might require:
- A work order to repair the device
- An action to investigate why the previous test did not identify the problem
- A reinspection before return to service
- A notification to inspect similar assets
Create separate records when different people, due dates or completion criteria apply.
Avoid combining unrelated responsibilities into one broad action that cannot be tracked clearly.
Monitor progress #
After the action or work order has been assigned:
- Check its status
- Confirm that responsibility was accepted
- Monitor the due date
- Review added notes and evidence
- Follow up on overdue work
- Confirm that operational restrictions remain in place
- Escalate blocked critical work
- Review any changes to scope or priority
- Confirm whether additional defects were identified
The inspection owner or reviewer should not assume that another user is monitoring the work unless responsibility has been clearly assigned.
Complete the action or work order #
The responsible person should record:
- Work performed
- Date and time completed
- Parts or materials used, where applicable
- Measurements or test results
- Completion comments
- Photographs or attachments
- Remaining limitations
- Additional work required
- Person completing the work
The work record should not be closed if the required activity remains incomplete.
Verify the corrective work #
Before treating the inspection finding as resolved:
- Review the completed action or work order.
- Confirm that the stated work was performed.
- Review completion evidence.
- Check test results or measurements.
- Confirm that the original defect has been addressed.
- Determine whether reinspection is required.
- Confirm that operational restrictions can be removed.
- Record the verification decision.
- Update the finding’s status where authorised.
The person verifying the work should be suitably competent and independent where required.
Arrange a follow-up inspection #
Create another inspection when:
- The repair must be physically verified
- A safety-critical function must be retested
- The original item could not be inspected
- A temporary correction was applied
- The defect requires monitoring
- A specialist recommends reinspection
- Organisational or regulatory procedures require it
The follow-up inspection should reference:
- The original inspection
- The original finding
- The corrective action or work order
- The completed work
- The acceptance criteria
Do not close the original finding until the required verification has been completed.
Return the asset to service #
Returning an asset to service should follow your organisation’s authorised process.
Before release, confirm that:
- Required work is complete
- Tests were successful
- Required evidence is present
- Follow-up inspection has passed
- Safety controls can be removed
- The appropriate person approved release
- Asset status is correct
- Relevant users have been informed
Closing a work order does not automatically mean the asset is authorised to return to service.
Close the inspection finding #
Close or resolve the finding only when:
- The corrective work is complete
- Completion evidence has been reviewed
- Required testing has passed
- Reinspection is complete, where required
- The responsible reviewer accepts the outcome
- Operational restrictions have been addressed
- Any residual risk has been formally accepted
- Resolution comments have been recorded
If AssetIQ provides a resolution action:
- Open the original finding.
- Review the linked work.
- Enter the resolution details.
- Select the appropriate resolution status.
- Save the change.
- Confirm that the finding is shown as resolved.
Do not close the finding merely because a work order was created.
When no corrective work is required #
A reviewer may determine that no corrective action is necessary.
Examples might include:
- A minor cosmetic condition accepted by policy
- An observation within acceptable limits
- A duplicate finding already covered by existing work
- A reported issue that could not be confirmed
- A condition intentionally monitored without immediate work
Record:
- The decision
- The reason
- Who authorised it
- Any monitoring requirement
- The review date, where applicable
Do not simply close the finding without explanation.
Common issues #
The Create Work Order option is unavailable #
Your role may lack permission, or the current inspection status may not allow work-order creation.
Create the work order from the Maintenance module if permitted and manually reference the inspection. Otherwise, contact the appropriate asset or maintenance manager.
The inspection details did not carry into the work order #
Enter the asset, inspection reference, finding description and supporting information manually. Confirm the relationship before issuing the work.
A duplicate work order already exists #
Review the existing work order. If it covers the same defect, link or reference it instead of creating another one.
Cancel an accidental duplicate according to your organisation’s process.
The required assignee is unavailable #
Assign the work to the responsible team or coordinator rather than an unqualified user. Escalate urgent work if the required resource is unavailable.
The finding is critical, but parts are unavailable #
Keep the asset isolated or restricted, document the delay and escalate the risk. Do not lower the severity or close the finding because the repair cannot be completed immediately.
The work order is complete, but the finding remains open #
Review the completion evidence and perform any required reinspection. An authorised reviewer can then resolve the finding.
The work order was closed without fixing the defect #
Reopen or create additional work according to your organisation’s process. Keep the inspection finding open and document why the previous work did not resolve it.
The asset remains unsafe after repair #
Do not return it to service. Record the failed verification, maintain operational controls and initiate further assessment or corrective work.
Recommended practices #
When creating follow-up work:
- Review existing open work first
- Link the work to the correct asset and inspection finding
- Distinguish the observed problem from the required action
- Use clear titles and detailed descriptions
- Apply severity and priority consistently
- Assign a competent person or team
- Set a risk-based due date
- Include safety and operational restrictions
- Define measurable completion criteria
- Retain supporting evidence
- Monitor overdue and critical work
- Verify completion before resolving the finding
- Require reinspection where appropriate
- Maintain traceability from finding to closure
Next steps #
After creating the action or work order:
- Monitor it through completion
- Verify the completed corrective work
- Arrange a follow-up inspection where required
- Confirm that the asset is authorised for return to service
- Resolve the original finding
- View and Export Inspection Results
For related guidance, see: