Overview #
Resource availability indicates whether an asset or another configured resource can be scheduled for a proposed activity and period.
A resource may become unavailable because of maintenance, inspection, repair, transport, operational restrictions or another planned or unexpected condition.
Recording unavailability helps prevent new activities from being assigned to a resource that cannot be used.
Important: Removing an unavailability entry does not prove that the resource is safe or operational. Confirm its condition, inspection and return-to-service requirements before making it available.
Availability versus operational readiness #
Calendar availability and operational readiness are related but different.
| Item | What it describes | Example |
|---|---|---|
| Calendar availability | Whether a scheduling commitment exists | No activity scheduled next week |
| Planned unavailability | A recorded period when the resource must not be scheduled | Workshop maintenance from 8–10 September |
| Operational status | Whether the asset can currently be used | Under repair |
| Inspection status | Whether required inspection is complete | Return inspection pending |
| Current location | Where the asset is physically located | Melbourne workshop |
| Resource suitability | Whether it meets a particular requirement | Crane capacity is insufficient for the proposed work |
A resource can have a free calendar period and still be unavailable or unsuitable.
Common reasons for unavailability #
A resource may be unavailable because of:
- Preventive maintenance
- Corrective repair
- Failed inspection
- Mandatory inspection
- Certification renewal
- Calibration
- Cleaning
- Refueling or charging
- Transport
- Preparation
- Reconfiguration
- Missing component
- Safety restriction
- Quarantine
- Workshop hold
- Awaiting technical assessment
- Seasonal storage
- Site shutdown
- Another approved reason
Use the most accurate reason available in your AssetIQ environment.
Planned versus unplanned unavailability #
Planned unavailability #
Planned unavailability is known in advance.
Examples include:
- Scheduled maintenance
- Annual certification
- Planned calibration
- Workshop preparation
- Transport between locations
- Seasonal storage
Record planned unavailability early so future activities can be scheduled around it.
Unplanned unavailability #
Unplanned unavailability occurs unexpectedly.
Examples include:
- Breakdown
- Failed inspection
- Accident damage
- Missing component
- Safety isolation
- Delayed return
- Transport failure
Record it promptly and review every affected activity.
Before you begin #
Before creating an unavailability record, confirm:
- The correct resource has been identified
- The reason is understood
- The start date is known
- The expected end date is known or can be estimated
- Existing commitments can be reviewed
- Responsibility for resolution is assigned
- You have permission to manage availability
For safety-related restrictions, apply the required physical controls before updating AssetIQ.
Open the resource schedule #
- Sign in to AssetIQ.
- Open Scheduling, Resource Planning or the corresponding module.
- Search for the resource.
- Confirm its unique asset or resource number.
- Open its calendar or timeline.
- Review current and future activities.
- Check existing availability or unavailability records.
Do not create a duplicate unavailability record if the same period and reason are already represented.
Confirm the resource identity #
Verify:
- Asset or resource number
- Description
- Serial or registration number
- Category
- Current location
- Business unit
- Operational status
Similar descriptions can lead to restrictions being recorded against the wrong resource.
Determine the correct type of record #
Use the business record that best represents the reason.
For example:
| Reason | Appropriate record may be |
|---|---|
| Preventive maintenance | Maintenance order |
| Corrective repair | Work order |
| Required inspection | Inspection |
| Active rental | Rental job |
| Transport or preparation hold | Resource-unavailability record |
| General workshop hold | Resource-unavailability record |
| Safety restriction | Fault, inspection finding, asset status or configured restriction |
Where maintenance, inspection or rental records already create schedule entries, avoid creating an unnecessary duplicate block.
Create an unavailability record #
Where AssetIQ provides a dedicated function:
- Open the resource schedule or details.
- Select Add Unavailability, Block Resource, Mark Unavailable or the corresponding action.
- Select the reason or type.
- Enter the start date and time.
- Enter the expected end date and time.
- Select the location where relevant.
- Assign a responsible user.
- Add clear notes.
- Review scheduling conflicts.
- Save or confirm the record.
- Verify that it appears on the calendar.
The exact fields depend on the current configuration.
Enter the start date #
Record when the resource becomes unavailable.
Use:
- Planned start for future unavailability
- Actual start for an unexpected restriction
- Exact time where operationally important
Do not use an earlier date merely to make the schedule appear consistent.
Enter the expected end date #
Enter the best available estimate of when the resource may become available.
Consider:
- Maintenance duration
- Parts lead time
- Inspection timing
- Transport
- Testing
- Approval
- Return-to-service checks
The expected end date is not a guarantee.
Update it when better information becomes available.
Open-ended unavailability #
If the end date is unknown:
- Use an open-ended option where available
- Select an approved placeholder process
- Record that the date is estimated
- Assign responsibility
- Set a review date
- Monitor the restriction
Do not enter an arbitrary short end date that could make the resource appear available prematurely.
Select the unavailability reason #
Choose the reason that best represents the restriction.
Possible values may include:
- Maintenance
- Repair
- Inspection
- Certification
- Transport
- Cleaning
- Preparation
- Out of Service
- Safety Hold
- Other
Use the exact values available in AssetIQ.
Avoid selecting Other when a suitable specific reason exists.
Add clear notes #
Notes should explain:
- Why the resource is unavailable
- What work or condition is involved
- Expected resolution
- Responsible person
- Related record
- Operational restrictions
- Next review date
Preferred note #
“Asset unavailable after failed return inspection. Hydraulic leak recorded against inspection INS-0128. Work order WO-1042 assigned to Melbourne workshop. Availability to be reviewed after repair and pressure test.”
Note to avoid #
“Asset unavailable.”
Link related records #
Where available, link the unavailability to:
- Maintenance order
- Work order
- Inspection
- Finding
- Rental return
- Transport activity
- Another relevant record
This provides traceability and helps users understand what must happen before the resource can become available.
Review existing commitments #
Before confirming unavailability, review all activities within or immediately after the restricted period.
Identify:
- Rentals
- Maintenance
- Inspections
- Audits
- Internal work
- Transport
- Other reservations
Record or create the unavailability even when it conflicts with existing work, particularly when the restriction is safety-related. Then resolve the affected commitments.
Handle activities affected by unavailability #
For each affected activity:
- Open the record.
- Confirm whether the resource is essential.
- Assess the operational impact.
- Select another suitable resource where possible.
- Change the dates where authorized.
- Notify the activity owner.
- Update related records.
- Confirm the revised schedule.
Do not delete an affected confirmed activity without following its cancellation or rescheduling process.
Safety-related unavailability #
When an asset is unsafe:
- Stop use.
- Apply isolation, tagging or other physical controls.
- Record the fault or finding.
- Mark or schedule the resource as unavailable.
- Notify responsible users.
- Review affected work.
- Create corrective action.
- Keep the restriction until authorized release.
AssetIQ’s availability record does not replace physical isolation.
Maintenance-related unavailability #
A maintenance order or work order may automatically make the asset unavailable.
Confirm:
- Planned work dates
- Workshop location
- Work-order status
- Expected completion
- Required testing
- Return-to-service approval
Avoid creating a duplicate scheduling block unless additional preparation or transport time must also be represented.
Inspection-related unavailability #
An asset may need to remain unavailable when:
- Mandatory inspection is due
- Inspection failed
- Inspection is incomplete
- Required evidence is missing
- Approval is pending
- Re-inspection is required
Do not release the asset based solely on the scheduled inspection date. Confirm the inspection outcome.
Transport and preparation unavailability #
A resource may be unavailable while:
- Moving between sites
- Being loaded or unloaded
- Undergoing cleaning
- Being refueled or charged
- Being reconfigured
- Awaiting dispatch inspection
Record these periods where they materially affect scheduling.
Extend an unavailability period #
If the resource will remain unavailable longer than expected:
- Open the unavailability or originating record.
- Confirm the revised end date.
- Record the reason for the delay.
- Review future activities.
- Resolve new conflicts.
- Notify affected users.
- Save the extension.
- Verify the calendar.
Do not let the original end date pass without updating the schedule when the resource remains restricted.
Shorten an unavailability period #
If the resource becomes ready earlier:
- Confirm the required work is complete.
- Review inspection and testing evidence.
- Obtain return-to-service approval where required.
- Enter the revised end date.
- Update the originating record.
- Review the calendar.
- Notify affected users.
Do not shorten the period solely because another activity requires the resource.
Review unavailability regularly #
Review active restrictions for:
- Current status
- Expected completion
- Responsible owner
- Open work
- Parts or external dependencies
- Inspection requirements
- Future scheduling conflicts
- Updated expected date
Open-ended or overdue restrictions should not remain without active ownership.
Restore resource availability #
Before restoring availability, confirm:
- Required work is complete
- Inspection or testing has passed
- Safety restrictions are removed
- Required components are present
- Certification is valid
- Resource location is correct
- Return-to-service approval is recorded
- Related records are updated
- No other restriction remains
Then:
- Open the unavailability or originating record.
- Select Complete, Release Resource, Mark Available or the corresponding action.
- Enter completion information.
- Add evidence where required.
- Confirm the action.
- Review the resource’s operational status.
- Check the calendar.
- Notify affected users.
Availability does not mean suitability #
Even after the resource becomes available, confirm it meets the next activity’s:
- Capacity requirement
- Configuration
- Location
- Certification
- Accessories
- Operating environment
- Technical requirements
Availability only indicates that the resource is not restricted for the proposed period.
Cancel planned unavailability #
Cancel a planned record when the restriction will not occur.
Before cancellation:
- Confirm the correct record.
- Review whether related work was cancelled or moved.
- Enter the reason.
- Cancel through the authorized process.
- Check that availability is restored.
- Notify affected users.
- Retain cancellation history.
Do not delete historical unavailability that actually occurred.
Correct an incorrect record #
If unavailability was recorded against the wrong resource or dates:
- Stop relying on the incorrect schedule.
- Record the error.
- Correct or cancel through the authorized process.
- Create the correct record.
- Review affected activities.
- Notify users.
- Preserve correction history.
Common issues #
The Add Unavailability action is unavailable #
Your role may lack permission, or the restriction may need to be created through Maintenance, Inspections or another module.
The resource remains select-able #
Check whether the unavailability was confirmed, whether the dates cover the proposed activity and whether AssetIQ treats the record as blocking or informational.
The calendar shows duplicate unavailability #
Review whether a maintenance or inspection record already created an automatic schedule entry.
The expected end date is unknown #
Use an open-ended process where available, assign ownership and set a review date.
The restriction ended, but the resource remains unavailable #
Check the originating work order, inspection, operational status and completion workflow.
The resource became available automatically after the end date #
Confirm that required work and inspections are actually complete. Reapply the restriction if the asset is not ready.
Existing activities overlap the new restriction #
Review and reschedule affected activities. Do not remove the safety restriction to preserve the original plan.
The resource is available but still cannot be scheduled #
It may be unsuitable, at another location, missing components or restricted by another record.
Recommended practices #
When managing availability:
- Use the correct originating record
- Verify the resource using a unique identifier
- Record restrictions promptly
- Use accurate start dates
- Use realistic end dates
- Avoid arbitrary dates for uncertain work
- Add clear reasons and ownership
- Link related records
- Review affected commitments
- Prioritize safety restrictions
- Update extensions promptly
- Monitor open-ended unavailability
- Verify readiness before release
- Preserve historical restrictions
- Distinguish availability from suitability
Next steps #
Continue with:
- View Asset and Resource Schedules
- Review affected rentals and operational work
- Monitor maintenance and inspection completion
- Recheck availability before allocating the resource
For related guidance, see: