Skip to content
No results
  • AssetIQ Help Portal
assetiq logo final horizontal jan 2026 trans website logo
Success Center
  • Home
  • Getting Started
assetiq logo final horizontal jan 2026 trans website logo
Success Center

Getting Started

6
  • Welcome to AssetIQ
  • Sign in to AssetIQ
  • Reset your AssetIQ password
  • Understand the Dashboard
  • Change Your Language in AssetIQ
  • Navigate AssetIQ and Use the Sidebar

Asset Management

8
  • Add Your First Asset
  • Edit an Asset
  • Find and Filter Assets
  • Assign an Asset
  • Import Assets
  • Export Asset Data
  • Generate Asset QR Codes
  • Scan an Asset QR Code

Maintenance

5
  • Introduction to Maintenance and Work Orders
  • Create a Work Order
  • Understand Work-Order Statuses
  • Review the Next Maintenance Date
  • Update and Complete a Work Order

Inspections

8
  • Introduction to Asset Inspections
  • Understand Inspection Types and Checklists
  • Create and Assign an Asset Inspection
  • Conduct and Submit an Asset Inspection
  • Record Inspection Findings and Defects
  • Review and Approve Inspection Results
  • View and Export Inspection Results
  • Create Follow-up Actions or Work Orders

Asset Audits

6
  • Introduction to Asset Audits
  • Understand Asset Audit Types
  • Create and Assign an Asset Audit
  • Conduct and Submit an Asset Audit
  • Review Audit Discrepancies
  • Export Asset Audit Results

Rental Management

12
  • Introduction to Rental Management
  • Understand the Rental Job Lifecycle and Statuses
  • Create a Rental Job
  • Add and Allocate Assets to a Rental Job
  • Check Asset Availability and Resolve Conflicts
  • Dispatch Assets and Start a Rental
  • Extend or Update an Active Rental
  • Return Assets and Record Their Condition
  • Close a Rental Job
  • View and Export Rental History
  • Manage Overdue Rentals and Outstanding Assets
  • Manage Rental Damage and Missing Items

Scheduling & Resources

8
  • Introduction to Scheduling and Resources
  • Understand the Scheduling Calendar
  • Find and Filter Scheduled Activities
  • Schedule Assets and Resources
  • Reschedule or Update an Activity
  • Identify and Resolve Scheduling Conflicts
  • Manage Resource Availability and Unavailability
  • View Asset and Resource Schedules

Reports & Analytics

8
  • Introduction to Reports and Analytics
  • Understand Dashboards and Key Metrics
  • Filter and Analyze Report Data
  • View Asset Management Reports
  • View Maintenance and Inspection Reports
  • View Rental and Utilization Reports
  • Export Report Data
  • Troubleshoot Report and Dashboard Data

Administration

2
  • Set Up Master Data
  • Invite Users and Assign Roles
View Categories
  • Home
  • Documentation
  • Scheduling & Resources
  • Understand the Scheduling Calendar

Understand the Scheduling Calendar

10 min read

0:00 / 11:06
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)

Overview #

The AssetIQ scheduling calendar provides a time-based view of planned and active resource commitments.

Depending on the modules and features enabled for your organization, the calendar may display activities such as rentals, maintenance, work orders, inspections, audits and periods of resource unavailability.

Use the calendar to understand what is planned, identify possible conflicts and open the related AssetIQ records for further review.

Important: An empty period on the calendar does not automatically mean that a resource is available or ready for use. Review its status, location, condition, maintenance and inspection requirements.

Open the scheduling calendar #

  1. Sign in to AssetIQ.
  2. From the sidebar, open Scheduling, Resource Planning, Calendar or the corresponding module.
  3. Wait for the schedule to load.
  4. Confirm the displayed date range.
  5. Review any active location, resource or activity filters.

The exact menu and page names depend on the current AssetIQ interface.

What the calendar displays #

A calendar entry may represent:

  • Rental job
  • Maintenance order
  • Work order
  • Asset inspection
  • Asset audit
  • Planned resource unavailability
  • Internal operational activity
  • Another configured scheduled record

Each entry may show information such as:

  • Activity title
  • Reference number
  • Asset or resource
  • Activity type
  • Status
  • Start date and time
  • End date and time
  • Location
  • Responsible person
  • Priority
  • Conflict indicator

The level of detail shown depends on the selected calendar view and available screen space.

Calendar structure #

The scheduling screen may contain:

  • Date navigation
  • Today button
  • Calendar-view selector
  • Resource rows or columns
  • Time scale
  • Activity entries
  • Search
  • Filters
  • Legend
  • Status or conflict indicators
  • Activity-detail panel
  • Scheduling actions

The exact arrangement may differ between desktop, tablet and mobile screens.

Calendar views #

Depending on your configuration, AssetIQ may provide one or more calendar views.

Day view #

Day view displays activities for a single date.

Use it to:

  • Review detailed daily work
  • Check activity start and end times
  • Coordinate same-day resource movements
  • Identify time-specific overlaps
  • Review dispatch, maintenance or inspection activity

Day view is useful when precise timing is important.

Week view #

Week view displays activities across a seven-day or working-week period.

Use it to:

  • Plan upcoming operational work
  • Review near-term asset commitments
  • Coordinate preparation and transport
  • Identify activities finishing or starting soon
  • Monitor expected returns

This is often the most practical view for routine operational planning.

Month view #

Month view provides a broader picture of scheduled activities.

Use it to:

  • Review future demand
  • Identify busy periods
  • Plan maintenance windows
  • Monitor longer rental periods
  • Identify gaps requiring further investigation
  • Review work across several weeks

Because less detail fits on each entry, open the activity record before making decisions.

Timeline view #

A timeline displays activities horizontally across a time scale.

Resources may appear in separate rows, making it easier to compare commitments.

Use it to:

  • Review one asset’s schedule
  • Compare several resources
  • Identify overlapping activities
  • Review the sequence of rentals and maintenance
  • Check turnaround time between activities

Resource view #

Resource view groups scheduled activities by asset, equipment category or another resource type.

Use it to:

  • Compare available periods
  • Review competing commitments
  • Identify heavily scheduled resources
  • Find possible alternative assets
  • Examine scheduling patterns

List view #

List view displays scheduled activities as rows rather than calendar blocks.

It may be useful for:

  • Sorting by date
  • Reviewing detailed references
  • Searching large numbers of activities
  • Exporting or printing
  • Viewing activities on smaller screens

Use only the views available in your AssetIQ environment.

Change the calendar view #

To change views:

  1. Open the calendar.
  2. Locate the view selector.
  3. Choose Day, Week, Month, Timeline, Resource or the available option.
  4. Confirm the displayed date range.
  5. Review whether existing filters remain active.

Changing the view does not normally change the underlying records.

Navigate between dates #

Use the calendar navigation to move to:

  • Previous period
  • Next period
  • Today
  • A selected date
  • A selected week or month

To return to the current date, select Today or the corresponding action.

After navigating, confirm the displayed date range before interpreting the schedule.

Understand resource rows #

In a resource-based view, each row may represent:

  • Individual asset
  • Asset category
  • Equipment group
  • Location
  • Facility
  • Another configured resource

Check the row label carefully before reviewing its activities.

Assets with similar descriptions should be distinguished using their unique asset numbers.

Understand calendar entries #

A scheduled activity may appear as a colored bar, card or block.

Its position indicates:

  • Start date or time
  • End date or time
  • Duration
  • Assigned resource
  • Relationship to other activities

The displayed block may represent planned rather than actual time.

Open the activity to confirm its detailed dates and current status.

Open a calendar entry #

To review an activity:

  1. Select or click the calendar entry.
  2. Review the summary or pop-up.
  3. Confirm the activity type and reference.
  4. Review the resource, dates, location and status.
  5. Select View Details, Open Record or the corresponding action if further information is required.

The underlying record may open in Rental Management, Maintenance, Inspections or another AssetIQ module.

Calendar colors #

Calendar colors may indicate:

  • Activity type
  • Status
  • Priority
  • Location
  • Business unit
  • Availability
  • Another configured classification

Always check the calendar legend before interpreting a color.

For example, red might mean:

  • Scheduling conflict
  • Overdue activity
  • High priority
  • Maintenance activity
  • Another organization-specific meaning

Do not rely on color alone. Review the entry’s label, status and details.

Calendar legend #

The legend explains the colors, icons or patterns used on the schedule.

The legend may identify:

  • Rentals
  • Maintenance
  • Inspections
  • Audits
  • Unavailability
  • Completed activities
  • Pending activities
  • Conflicts
  • Overdue items

If a displayed indicator is unclear, confirm its meaning before changing the schedule.

Status indicators #

Calendar entries may show statuses such as:

  • Draft
  • Scheduled
  • Confirmed
  • Pending
  • In Progress
  • Active
  • Overdue
  • Completed
  • Cancelled
  • Unavailable

The same status word may have different meanings in different modules.

For example, Active on a rental means the rental is underway, while an active asset lifecycle status means that the asset remains part of the operational asset register.

Open the underlying record when the status meaning is important.

Planned versus actual activities #

The calendar may display:

  • Planned dates
  • Actual dates
  • Revised dates
  • A combination of these values

For example:

  • A rental may display its planned start and revised return dates
  • A maintenance order may display its scheduled work period
  • A completed inspection may show its planned date rather than submission time

Review the underlying record to confirm whether dates are planned, revised or actual.

Multi-day activities #

Activities continuing across several days may appear as:

  • One continuous calendar bar
  • Repeated daily entries
  • A start and end marker
  • Another configured display

Open the entry to confirm the complete duration.

Do not assume that a multi-day activity occupies the resource continuously unless the related business process indicates that it does.

Activities outside the visible period #

A long-running activity may start before or end after the displayed period.

The calendar may show:

  • An arrow
  • A truncated bar
  • A continuation indicator
  • A partial entry

Navigate to the previous or next period or open the activity to review its full dates.

Overlapping activities #

Overlapping entries may indicate:

  • A valid related activity
  • A potential scheduling conflict
  • Several activities forming part of the same job
  • A data-entry error
  • An approved exception
  • Different times within the same day
  • An activity that does not exclusively reserve the resource

Do not assume every visual overlap is an error.

Open both records and confirm:

  • Exact dates and times
  • Activity types
  • Asset or resource
  • Statuses
  • Location
  • Whether each activity reserves the resource
  • Approval or exception information

Scheduling conflict indicators #

AssetIQ may indicate a conflict using:

  • Warning icon
  • Highlighted border
  • Alert message
  • Color
  • Conflict label
  • Blocking validation

A conflict may result from:

  • Two rentals using the same asset
  • Rental overlapping maintenance
  • Inspection overlapping operational use
  • Resource unavailability
  • Insufficient turnaround time
  • Location incompatibility
  • An extended activity
  • Another configured rule

See Identify and Resolve Scheduling Conflicts.

Gaps between activities #

A visible gap may still be insufficient because the resource requires:

  • Return transport
  • Cleaning
  • Inspection
  • Maintenance
  • Refueling or charging
  • Reconfiguration
  • Loading
  • Delivery
  • Site preparation

Review the full operational requirement before allocating the resource.

Filters and the calendar #

Active filters may hide relevant commitments.

Filters may limit the calendar by:

  • Asset
  • Resource group
  • Activity type
  • Location
  • Business unit
  • Status
  • Responsible user
  • Date
  • Priority

Before concluding that a resource has no scheduled work, check which filters are active.

See Find and Filter Scheduled Activities.

Search within the schedule #

Where search is available, you may be able to find activities using:

  • Activity reference
  • Asset number
  • Asset description
  • Rental-job reference
  • Maintenance-order reference
  • Location
  • Responsible user

Use a unique identifier where possible.

Clear the search to restore the complete schedule.

Refresh the calendar #

The schedule may need to be refreshed after another user:

  • Creates an activity
  • Changes dates
  • Records an extension
  • Returns an asset
  • Completes maintenance
  • Cancels a job
  • Changes resource availability

Use Refresh, reload the page or reopen the calendar according to the interface.

Do not make an important allocation decision using information you know may be outdated.

Drag-and-drop behavior #

If AssetIQ supports drag-and-drop, moving an entry may change:

  • Start date
  • End date
  • Assigned resource
  • Another scheduling field

Before moving an entry:

  1. Confirm you have permission.
  2. Open the underlying record.
  3. Understand what will change.
  4. Review dependent activities.
  5. Check required approval.
  6. Confirm the new dates and resource.
  7. Resolve any warning.
  8. Record the reason where required.

Avoid experimenting with drag-and-drop on live operational records.

Resize an activity #

If calendar entries can be resized, extending or shortening the block may change the activity dates.

Before confirming:

  • Check the new duration
  • Review availability
  • Check future commitments
  • Review maintenance and inspections
  • Confirm the change with responsible users
  • Update related documents

Do not visually shorten an activity to remove a conflict unless the underlying business dates have genuinely changed.

Read-only calendar access #

Some users may have permission to view the schedule but not change it.

Read-only users may still be able to:

  • Navigate dates
  • Change views
  • Apply filters
  • Search activities
  • Open permitted records
  • Review availability

If scheduling controls are unavailable, your role may be read-only.

Mobile and smaller-screen use #

On smaller screens:

  • Fewer details may appear
  • Entries may be grouped
  • Horizontal scrolling may be required
  • List view may be easier to use
  • Filters may appear in a separate panel
  • Full details may require opening the activity

Use a desktop or larger screen for complex multi-resource planning where practical.

Common issues #

The calendar appears empty #

Check:

  • Date range
  • Active filters
  • Selected location
  • Selected resource group
  • Search term
  • Organization
  • Permissions

An expected activity is missing #

Confirm that:

  • The underlying record was saved
  • Required dates are present
  • The status allows it to appear
  • The correct resource is assigned
  • The active filters include its type
  • The record belongs to the selected organization

The same activity appears more than once #

It may involve multiple resources or separate asset lines. Open each entry before reporting it as a duplicate.

The displayed dates look incorrect #

Open the underlying record and compare planned, revised and actual dates.

The calendar has not updated #

Refresh it and confirm that the originating record was saved successfully.

A color is unclear #

Check the legend or open the entry. Do not rely on assumptions.

Two activities overlap #

Review both records and determine whether the overlap is valid, related or conflicting.

The calendar shows a free period, but the asset cannot be selected #

The asset may have an operational, location, maintenance, inspection or permission restriction not represented as a calendar entry.

Recommended practices #

When using the scheduling calendar:

  • Confirm the displayed date range
  • Check active filters
  • Use unique asset identifiers
  • Review the legend
  • Open entries before making decisions
  • Distinguish planned and actual dates
  • Investigate overlaps
  • Allow turnaround time
  • Review the underlying record
  • Refresh after important updates
  • Avoid unapproved drag-and-drop changes
  • Do not treat calendar gaps as guaranteed availability
  • Use list or timeline views for detailed comparison
  • Keep related records current

Next steps #

Continue with:

  • Find and Filter Scheduled Activities
  • Schedule Assets and Resources
  • Reschedule or Update an Activity
  • Identify and Resolve Scheduling Conflicts
  • Manage Resource Availability and Unavailability
  • View Asset and Resource Schedules

For a general introduction, see Introduction to Scheduling and Resources.

Updated on September 2, 2026

What are your Feelings

  • Happy
  • Normal
  • Sad

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Introduction to Scheduling and ResourcesFind and Filter Scheduled Activities

Powered by BetterDocs

Leave a ReplyCancel Reply

Your email address will not be published. Required fields are marked *

Table of Contents
  • Overview
  • Open the scheduling calendar
  • What the calendar displays
  • Calendar structure
  • Calendar views
    • Day view
    • Week view
    • Month view
    • Timeline view
    • Resource view
    • List view
  • Change the calendar view
  • Navigate between dates
  • Understand resource rows
  • Understand calendar entries
  • Open a calendar entry
  • Calendar colors
  • Calendar legend
  • Status indicators
  • Planned versus actual activities
  • Multi-day activities
  • Activities outside the visible period
  • Overlapping activities
  • Scheduling conflict indicators
  • Gaps between activities
  • Filters and the calendar
  • Search within the schedule
  • Refresh the calendar
  • Drag-and-drop behavior
  • Resize an activity
  • Read-only calendar access
  • Mobile and smaller-screen use
  • Common issues
    • The calendar appears empty
    • An expected activity is missing
    • The same activity appears more than once
    • The displayed dates look incorrect
    • The calendar has not updated
    • A color is unclear
    • Two activities overlap
    • The calendar shows a free period, but the asset cannot be selected
  • Recommended practices
  • Next steps

AssetIQ - Success Center

Your go-to resource for AssetIQ documentation, guides, and support. Learn, explore and get the most out of AssetIQ.

    Resources

    • Video Tutorials
    • Release Notes
    • Best Practices
    • FAQs

    Company

    • About AssetIQ
    • AssetIQ Website
    • Privacy Policy
    • Terms of Service

    Copyright © 2026 - AssetIQ by Arvant Technologies Pte Lte